Esse Plus 1 Instruções de Operação Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 18
17
Fig C
Blanking plate
Inspection hatch
in flue pipe
Inspection hatch
in blanking plate
Fig D
6” flue pipe
connected to
exit flue
6” flue pipe
connected to
exit flue
CLEANING THE EXIT FLUE - Every 12 months
It is essential to maintain the
integrity and cleanliness of the
flue to ensure that your cooker
continues to perform at its best.
When your cooker was installed
the main flue should have been
equipped with an inspection
hatch; either in the blanking plate
above the cooker next to the flue
pipe (Fig C) or in the flue pipe
itself. These hatches are designed
to allow periodic access to the flue
for cleaning which should ideally
be done by a chimney sweep.
Chimneys and flues vary widely in
terms of size, shape, length and
construction, but the principles of
the way they work are the same.
Keeping them clean and clear is
essential to maintain the optimum
performance of any woodburning
or multi-fuel appliance.
OPERATING TIPS
By taking time to get to know your cooker, following our
maintenance guidelines and using good quality firewood
you should enjoy trouble free operation of your Woodfired
cooker but it is also worth bearing in mind these useful
operating tips:
Don’t leave the cooker lit for long periods in slumbered
down mode (as you would for overnight burning), open
the air control and bank up the fire periodically to heat
up the cooker and flue to prevent soot build up.
Cut your logs to the size shown in Fig.6
to minimise the need for refuelling.
Fig.6
1
9cm
36cm
Vista de página 18
1 2 ... 14 15 16 17 18 19 20

Comentários a estes Manuais

Sem comentários